Read the evidence in order
Checks belong to a commit. Pushing a fix changes the head and can require new checks or review evidence.
The target finish line
A target normally works toward an open PR, green CI, and satisfied review requirements. Your project’s configuration controls those requirements. Review has a configured round limit. Reaching that limit can leave findings documented in the PR rather than resolved in code. Read the review findings themselves. “Reviewed” does not always mean “every suggested improvement was implemented.”CI is one reading
The CLI reference describes the PR status command. Its green CI verdict alone does not establish completed review. A pending check is unfinished work, not a failed check. An unknown or failed read is missing evidence, not a pass.A head with no completed run is unmeasured
Sometimes every Actions run on the head is still queued. Then no check has run, and the head is not green. F[no] calls this an unmeasured head. The status command prints a note that names it and the way out:ci unmeasured: no runs at <head>.
An unmeasured head does not block a merge. The status command’s ready field reports whether the merge gate permits a merge now. Here ready stays true. When auto_merge.require_checks_pass is true, the gate also adds the warning ci_unmeasured. But a target does not finish on it. The target reads the head as pending, so it does not report a green PR. Run fno do pr wait <PR> until a run completes.
Merging is a separate action
Automatic merging is disabled by default. A project can enable it, so check the effective policy before a run.What stops a merge
F[no] merges through one gate. The gate serves three doors: thefno do pr merge command, the PR watcher’s merge queue, and the merge that a finished target arms.
A raw
gh pr merge does not pass through this gate.
A merge over unpassed checks
A target ends with a named outcome.DonePRGreen means the PR exists, its checks passed and its review requirements are met.
A person or another tool can merge a PR before its checks pass. The target then reads the checks at the merged head. If any check is pending or failing, the run ends DoneMergedUnsettled, not DonePRGreen. The message names the counts:
DoneMergedUnsettled closes the run like DonePRGreen. The change ships, the claim is freed and the node closes. But the run never reports green, and it never arms a merge. The unpassed checks are now on the base branch. Read them before you treat the change as done.
A merged PR does not prove a website is deployed or a package is published. Those deliveries need their own evidence.
Next steps
- Run a fleet: assign your next task to a worker.
- Review and ship: inspect a PR at each stage.